DE-G

Semitronix DE-G User Exchange Area

Semiconductor and manufacturing peers exchange the usage, pitfalls, and practical cases of DE-G here: from data analysis, Control Chart, Process Capability to yield and Shmoo analysis. Raise your questions or share your practical experience.

Data Import and AnalysisControl Chart and Process MonitoringProcess Capability and Specification LimitsStatistical Analysis and Hypothesis Testing
13 Topics 29 Comments 13 Likes
Control Chart and Process Monitoring Featured

The yield hasn't dropped, but each wafer has more defects - how to set the threshold for the count based Control Chart?

In recent batches, the number of defects has been slowly increasing, and the yield is still within the specifications. We are concerned that this may be a systemic change. I would like to inquire about the grouping method and alarm boundaries for count based Control Charts.

ZZack·F24 · Process Engineer 15 hours ago Views 1685 Reply 2 Likes 84
In the past three weeks of sampling, the yield rate has been stuck above the specification line, but the number of defects per wafer is slowly increasing, with no single point exceeding the control limit, but the trend shows an upward trend. It is currently uncertain whether it is a normal fluctuation or a systemic change. I would like to ask how to select grouped samples, set alarm boundaries and rules when creating count based Control Charts (p/c/u) in DE-G, in order to capture this slow upward trend earlier.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

v
victor·song 12 hours ago

Are defects calculated by piece or by area? If the unit area is not consistent, using the u diagram is more reliable than the c diagram. Align the aperture first and then set the threshold.

N
Neil-Z 11 hours ago

@victor·song 对,我们之前混用了 c 图和 u 图,后来按面积归一才看出真实趋势。

woodcutter
Woodcutting Wind. Victor 14 hours ago

We have also encountered a similar situation where a single point does not exceed the limit but multiple points are on the same side continuously. It is recommended to first create a C-chart by batch or machine grouping, and then open the discrimination rule for 7 consecutive points on the same side to see.

Process Capability and Specification Limits Featured

How are Spec and Control Limit set in DE-G? What is the relationship between the two?

Just taking over the quality position, it's easy to mix specification limits and control limits together. I want to clarify where the two lines are matched in the software and which one should be used on site.

pPenny Song, Quality Supervisor 1 day ago Views 1660 Reply 2 Likes 89
I just transferred to the quality department and often mix specification limits (USL/LSL) and control limits (UCL/LCL) together when looking at the Control Chart. I want to confirm where these two lines are configured in DE-G: whether the specification limit is entered according to the drawing tolerance, and whether the control limit is calculated from data or can be manually adjusted? Which line should be used to determine anomalies on site, and how to understand the relationship between the two lines.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

j
jane.guo 10 hours ago

The control limit is generally calculated based on historical data (mean ± 3 σ), and it is not recommended to manually adjust it; The specification limit is entered in the specification/tolerance field. Exceeding the specification limit is considered unqualified, while exceeding the control limit requires investigation during the process.

r
ruby.hu 10 hours ago

@jane.guoAddendum: When the process is stable but the capability is insufficient, the control limit will fall within the specification limit. At this time, the Cpk (Process Capability Index) should be considered instead of exceeding the limit.

P
P.P 1 day ago

The specification limit is the requirement given by the customer/drawing, while the control limit is calculated based on the process's own fluctuations, two different things. Firstly, distinguish which one is SL and which one is CL on the diagram, and do not judge process stability based on specification limits.

Yield and Shmoo analysis Featured

How to stack the Shmoo curve with electrical data to see the failure boundary?

We need to align the Shmoo scan results with the corresponding electrical parameters, locate the failure boundary and inflection point, and consult the overlay analysis process in the software.

XX.L · Reliability Engineer 2 days ago Views 1465 Reply 2 Likes 97
When conducting reliability analysis, it is necessary to align the Shmoo scan results with the corresponding electrical parameter data, and clearly identify the failure boundary and inflection point positions. Now the two sets of data are viewed separately, and the boundary judgment is more subjective. I would like to ask how to perform the overlay analysis of Shmoo and electrical data in DE-G, how to align scan points and parameter points, and how to mark the failure boundary on the graph.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

horse
Ma Hugo 2 days ago

Before stacking, confirm that the scanning steps on both sides are consistent. If the steps are not consistent, misalignment may occur near the boundary. It is recommended to normalize the coordinates first.

g
grace.song 19 hours ago

First, match the Shmoo scanning point with the electrical parameters at the same coordinates (voltage/frequency/temperature), and then superimpose the boundary bands. The inflection point usually falls in the range where the parameters fall out of specification.

Data Import and Analysis

What file types does DE-G support when importing garbled data in other formats?

There are multiple sources on site, such as CSV, TXT, Excel, etc. Some files have garbled column names after parsing. I would like to confirm the supported formats and encoding processing methods.

bambooBamboo noise · Y · Quality Engineer 16 hours ago Views 1059 Reply 2 Likes 43
The on-site data sources are quite diverse, including CSV, TXT, and Excel. After importing some old files, the column names and Chinese content become garbled, and the factors do not match. I want to confirm which file types and encodings are supported by DE-G, where are the common issues with garbled characters, and whether to perform uniform transcoding before importing.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

M
Mia Xie 6 hours ago

In Excel, be careful not to include merged cells in the Chinese header. For CSV, it is recommended to save it as UTF-8 in Notepad first and then export it. Column names will be more stable.

Zhi
Zhilan. Wendy 15 hours ago

First, confirm the source file encoding. Old TXT files are often GBK, which can cause garbled characters when parsed in UTF-8. Saving them as UTF-8 or specifying the encoding during import can generally solve the problem.

Data Import and Analysis

How to map Excel merging cells and multi-level headers to factor columns during parsing?

The original report includes merged cells and multi-level headers. After importing, the factor columns are misaligned. Please ask how to specify field mapping in the plugin parsing.

brightMingyuan-Z · Data Analyst 2 days ago Views 1676 Reply 2 Likes 48
The original report consists of multi-level headers and merged cells. After importing DE-G, the factor columns are often misaligned, and the headers and data do not match. I would like to ask how to specify field mapping during parsing, how to merge cells into each row, and how to merge multi-level headers into single-layer factor columns.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

inkstone
Inkstone White - Liu 20 hours ago

Field mapping can be done by specifying factors/responses column by column in the import wizard. Misalignment is often caused by merging cells, resulting in null values being treated as new columns.

y
yuki.zhang 2 days ago

It is recommended to first expand and fill the merged cells into each row in Excel, flatten the multi-level header into one row, and then import it. Software side mapping will be much simpler.

Control Chart and Process Monitoring

Will the system automatically alert if the metrological Control Chart is on the same side for 7 consecutive points?

Do you want to know the software's support for anomaly detection rules (continuous same side, trend, etc.) and whether warnings are directly marked on the graph.

TTyler Gao · Process Engineer 6 days ago Views 1448 Reply 2 Likes 60
Now the main focus is on whether the metrological Control Chart has exceeded the limit. I want to know the software's support for anomaly detection rules, such as continuous 7-point same side and continuous upward/downward trends. Will it automatically mark in red on the chart as a warning, or do I have to count the points myself to judge.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

R
R.K 5 days ago

It is recommended to open the Westgard class rules according to on-site needs. By default, only the one exceeding 3 σ is enabled, and the same side and trend rules need to be manually enabled.

W
W.Y 4 days ago

Common differentiation rules (same side, trend, proximity limit, etc.) can generally be checked in the Control Chart rule settings, and the corresponding point will be highlighted when triggered.

Statistical Analysis and Hypothesis Testing

Should we use t-test or Mann Whitney test to compare two sets of parameters?

The sample size is not large and the distribution is skewed. I am unsure whether to choose parametric or non parametric testing and would like to confirm the selection criteria.

JJane Ye, R&D Engineer 10 days ago Views 1761 Reply 2 Likes 84
Two sets of Process Parameters need to compare the mean difference. The Sample Size is not large, and the data is still skewed. It is uncertain whether to use t-test or Mann Whitney rank sum test. I want to confirm the selection criteria: how to determine normality, sample size, and the degree of skewness to which non parametric testing should be used.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

K
K.X 8 days ago

Do not perform parameter testing on samples with a size below 30, non parameter testing is safer; After the significant difference in results, look at the effect size instead of just focusing on the p-value.

B
B.F 8 days ago

Perform normality test first, and use t-test for normality and homogeneity of variance; Mann Whitney is used for skewness or small sample sizes, as it compares distribution positions and is more stable for Outliers.

Process Capability and Specification Limits

Cpk (Process Capability Index) fluctuates around 1.33. What parameters should we start improving from?

Process Capability barely meets the standard but is unstable. I would like to sort out the order of improvement based on primary and secondary factors and seek common entry points.

RRyan Hu · Quality Engineer 11 days ago Views 1258 Reply 2 Likes 74
The critical dimension Cpk (Process Capability Index) has been fluctuating around 1.33, barely meeting the standard but unstable, and may drop when changing batches or operators. I would like to ask which parameters are usually started when sorting out the order of improvement, how to determine whether it is center offset or excessive fluctuation, and what improvement directions correspond to each.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

c
cathy·1986 10 days ago

The unstable fluctuations prioritize the machine, material batch, and measurement system, which are the most common sources of variation on site.

moon
Moon Shadow · Julie 10 days ago

Let's first separate Cp and Cpk (Process Capability Index): A low Cp indicates large fluctuations and needs to be reduced to become worse; A low Cpk (Process Capability Index) and a high Cpk indicate a center bias, so adjust the mean first. Use histograms and scatter plots to identify the main cause.

Statistical Analysis and Hypothesis Testing

How to choose between quantile n-1 method and n+1 method on site?

There are slight differences in the results of different software quantile algorithms, and I would like to know the applicable scenarios and verification methods of the two algorithms.

LiLi Alice, Data Analyst 14 days ago Views 1303 Reply 2 Likes 64
The quantile results of the same dataset may vary slightly in different software, which is due to the difference between the n-1 method and the n+1 method. I want to know what scenarios these two algorithms are suitable for, which one to choose when comparing specifications or estimating risks on site, and how to cross validate the results.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

face
Linxi · Z 12 days ago

It is recommended to indicate the quantile algorithm used in the analysis report and recalculate according to the same caliber during the review.

E
Evan Gao 13 days ago

When the Sample Size is large, there is little difference between the two methods; When the sample size is small or the tail extreme value is sensitive, a fixed caliber should be used and aligned with customer/drawing requirements to avoid cross software mismatch.

Design of Experiments (DOE) and Customization

Customized Design of Experiments (DOE): How to match DE-G if you want to fix some factors and customize levels?

Part of the factors are fixed, while the rest are customized at different levels. Please inquire about the steps for building a customized DOE and the entrance for interpreting the results.

ZZ. L · Process research and development 17 days ago Views 1435 Reply 2 Likes 85
I want to create a customized Design of Experiments (DOE): a few factors will be fixed at the existing level, and the remaining factors will be customized with their own levels and combinations. I would like to ask how to build this partially fixed and partially customized DOE in DE-G, how to set the level and number of experiments, and where to look for factor significance and interaction after the results are available.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

T
Tony Sun 15 days ago

The interpretation of the results starts with examining the Pareto Main Effect and interaction, followed by examining the effect graph for significant factors, and merging the error terms for insignificant factors.

Zhang
Zhang Bruce 17 days ago

First, mark the fixed factors as constants in the factor list, set the level of the factors to be studied, and then select the design type (full factor/partial factor/response surface). The software will automatically arrange the experimental combination.

Industry practical cases

Practical RF Data Analysis: The Complete Process from Raw Test Data to Conclusion

Share the entire process of analyzing a set of RF device data: parameter screening, distribution map, anomaly localization, and conclusion output.

containSeal - Nora · Application Consultant 27 days ago Views 1530 Reply 2 Likes 85
Share the complete analysis process of a set of RF device data: First, filter out effective parameters from the raw test data, look at the distribution chart and outliers, locate abnormal batches, align with process conditions, and finally output conclusions and recommendations. Welcome everyone to supplement their commonly used steps and tools in RF data analysis.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

b
ben.1995 26 days ago

For the step of anomaly localization, it is recommended to add a layer of batch/machine dimensions. Looking at the global distribution alone can easily mix different conditions together.

b
ben·1999 26 days ago

@ben.1995Agreed, do the Control Chart after layering, the trend will be much clearer.

j
jason·1994 26 days ago

This process is very complete. In RF analysis, we usually first look at the parameter correlation matrix, merge highly correlated parameters, and then perform distribution analysis, which can reduce the need to look at many redundant indicators.

Industry practical cases

What are the main difficulties in comparing multiple batches of data in advanced packaging scenarios?

Advanced packaging has multiple batches and complex structures, which can easily be interfered by differences in aperture during comparison. Therefore, it is important to communicate data alignment and comparison ideas.

JJulie Liang · Process Engineer 2026-10-26 Views 1332 Reply 2 Likes 64
Advanced packaging has multiple batches, complex structures and processes, and when comparing multiple batches of data, it is often interfered by differences in caliber: measurement positions, sample sizes, and units are inconsistent, and conclusions are prone to floating. I would like to exchange everyone's ideas on data alignment, caliber uniformity, and batch comparison.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

F
F.C 2026-10-27

Advanced packaging suggests incorporating structural dimensions as covariates for comparison, otherwise size differences may be misjudged as batch differences.

Song
Song Nora 2026-10-27

Before comparison, align the measurement caliber with the Sample Size, label the missing measurement batches separately, and then perform layered comparison by batch to avoid ranking data from different calibers in the same group.

Industry practical cases

What pitfalls have domestic statistical software encountered in entering the top consumer electronics supply chain?

Experience summary in data access, personnel deployment, and result review during the process from pilot to scale use.

IIvy Z12 Implementation Consultant 2026-10-21 Views 1622 Reply 2 Likes 47
Sharing several experiences of domestic statistical software from pilot workshops to large-scale promotion: unified data access standards, habits of front-line personnel, and analysis result review mechanism. Welcome colleagues who have made similar achievements to supplement their experience of stepping on pitfalls and coping strategies.
Is this content helpful to you? Like, bookmark, or recommend to colleagues; Forwarding links and QR codes automatically bring you attribution

Discussion 2

k
kate-1987 2026-10-21

It is recommended to retain a fixed standard analysis template for result review. Newcomers should follow it and experienced professionals should conduct sampling review, which can significantly reduce misreading.

K
Kevin Shen 2026-10-22

The biggest pitfall in landing is often not the software itself, but the historical data caliber and personnel habits. The time spent on unified caliber and training templates in the early stage will be saved in the later stage.