Industry practical cases

What type of tool did everyone first get started with when doing quality projects?

I want to summarize the starting points of commonly used tools for quality projects in the same industry, and provide newcomers with a reference sequence for getting started.

containSealed B · Quality Supervisor 8 hours ago Views 1592 Reply 3 Likes 54
I would like to ask which type of tools are the first to be used in quality improvement projects: flowcharts, checklists, Pareto, Cause and Effect Diagrams, or directly using Control Charts and Process Capability; What tools do different stages (problem definition, analysis, improvement, control) rely on. I would like to organize a list of tools for beginners to use in quality projects. Please feel free to add them.

Discussion 3

face
Linxi Z 8 hours ago

Stepping through similar pitfalls, selecting directions based on rankings in the early stages, only to realize that the problem is not truly important after completion. Defining the problem first is more laborious than rushing to use tools. 🙌

E
Eva Zhu 8 hours ago

The case is very practical and there are no clich é s.

N
Nina Sun 8 hours ago

We have also encountered similar situations on site. First, we will look at the batch or machine layer by layer, and the trend will be much clearer than mixing them together. It is recommended to align the caliber with the Sample Size before drawing a conclusion.

Design of Experiments (DOE)

How to arrange the number of repetitions for the center point after screening the experiment and transferring it to the response surface?

To screen for significant factors, we need to go up the response surface. We would like to inquire about the budget and arrangement for the central point duplication.

XuXu Ben, Data Analyst 8 hours ago Views 1045 Reply 2 Likes 65
Firstly, factor screening was conducted, and the remaining key factors need to be subjected to response surface analysis. I would like to ask how to determine the number of repetitions for the center point, and what are the main estimates for repeating the center point (pure error, curvature); When the sample budget is limited, how to arrange the ratio of the central point to the causal point more economically.

Discussion 2

Q
Quinn·F48 8 hours ago

Agree, first define the problem and then choose the tool. 🔥

Lü
Ada Lv 8 hours ago

The key to this problem is to first distinguish whether it is a center shift or excessive fluctuation, and then decide whether to adjust the mean or decrease it. Comparing the histogram and time series is more intuitive.

Quality Tools (MSA/SPC/Process Capability)

Which SPC Control Chart anomaly detection rules are more suitable for the site when opened?

There are too many false positives when the rules for distinguishing anomalies are fully open, and I would like to discuss the commonly used combinations of rules on site.

LuoEvan · Quality Engineer 8 hours ago Views 1155 Reply 2 Likes 59
There are a lot of false alarms when all the Control Chart anomaly detection rules are turned on. I would like to ask which rules (such as same side trend, continuous offset, over limit, etc.) are generally retained on site that are more in line with reality; Whether to distinguish the tightness of rules in different stages (monitoring stable process vs improvement period), and how to balance missed and false alarms.

Discussion 2

Z
Z.Y 8 hours ago

The case is very practical and there are no clich é s.

star
Star River P 8 hours ago

It is recommended to review the Measurement System first. If the deterioration caused by measuring tools and operating methods is not ruled out, the subsequent analysis conclusions may be biased. ✨

Han
Han Yuki 8 hours ago

@Star River P 同感,分层之后确实清楚很多。

Industry practical cases

Several Implementation Experiences of Promoting New Tools in the Workshop for Half a Year

The experience and pitfalls of promoting recording tools in data caliber, template training, and result review.

TTony Sun, Data Analyst 8 hours ago Views 1718 Reply 2 Likes 42
Experience of promoting statistical tools in the workshop for six months. Transitioning from following formulas to defining problems before selecting tools on the front line; Standard templates reduce repetitive labor; The review of the results relies on the supervision of senior colleagues. The time spent on unifying historical data caliber and training templates in the early stage was saved in the later stage. The tool itself is not difficult, the key is the migration of processes and personnel habits.

Discussion 2

I
Ivy Luo 8 hours ago

The case is very practical and there are no clich é s.

pine
Song Yan · Jane 8 hours ago

Additional point: Whether the conclusion can be implemented depends on the business context. Statistically significant results do not necessarily mean that action must be taken. It is more reliable to judge based on costs and on-site conditions.

north
North Island A 8 hours ago

@Song Yan · Jane 感谢补充,讲得更全面了。

Regression and Modeling

A record of regression modeling from factor screening to conclusion review

Review modeling: factor screening, regression fitting, residual diagnosis, and robustness of review conclusions.

OOlive Deng · Product Engineer 8 hours ago Views 1563 Reply 2 Likes 48
Record the regression modeling process once. Firstly, compare single factors and screen candidate variables for correlation, and then enter regression to examine the significance of coefficients and residual diagnosis; After discovering a trend in the residuals, non-linear terms were added and the coefficient Stability was rechecked; Finally, based on the business implications, determine which factors are truly actionable. Only after completing the two steps of residual diagnosis and conclusion review, can the model conclusion be used on site.

Discussion 2

I
Ian Xu 8 hours ago

Agree, first define the problem and then choose the tool.

D
Dylan Xu 8 hours ago

Additional point: Whether the conclusion can be implemented depends on the business context. Statistically significant results do not necessarily mean that action must be taken. It is more reliable to judge based on costs and on-site conditions.

Graphic Analysis and Exploration

A complete set of viewing sequences for our graphic exploration

Sharing graphic analysis sequence: univariate distribution → multiple group comparison → factor relationship, first examine the graph and then examine it.

HeNina · Process Engineer 8 hours ago Views 881 Reply 2 Likes 56
Share the sequence of our graphic exploration. First, look at the histograms and boxplots of each key response to understand the distribution and outliers; Make multiple comparison charts by team and batch to see where the differences lie; Then use a scatter plot to examine the relationship between factors and responses. First, identify the graphical clues, and then decide which tests and modeling to do, to avoid running formulas directly with data.

Discussion 2

R
Rita Gao 8 hours ago

We have also encountered it in our project, add a layered perspective.

j
jack_1986 8 hours ago

After layering, the trend and differentiation rules can be overlaid, and slow drift can be observed even without exceeding the limit of a single point, which is particularly practical on site. 👀

Quality Tools (MSA/SPC/Process Capability)

Quantitative MSA bias linearity does not pass, how to take the retest Sample Size?

Measuring tool R& R passed but the bias is unstable. We want to confirm the sample size and sampling location during the retest stage.

ZZoe Ma, R&D Engineer 8 hours ago Views 984 Reply 3 Likes 51
GR& in Measurement System Analysis (MSA); R is okay, but the bias and linear results do not pass. I would like to inquire about the sample size to be taken during the retest phase and which range positions to cover; Before retesting, should we first check the calibration of measuring tools and operating methods? The Measurement System has not ruled out whether the conclusion of Process Capability can be obtained first.

Discussion 3

sea
Hai Ruo. kevin 8 hours ago

The key to this problem is to first distinguish whether it is a center shift or excessive fluctuation, and then decide whether to adjust the mean or decrease it. Comparing the histogram and time series is more intuitive.

Dawn
Xiaofeng Wu 8 hours ago

Logic runs smoothly, compared to my own on-site experience. 🤝

N
Nina Han 8 hours ago

After layering, the trend and differentiation rules can be overlaid, and slow drift can be observed even without exceeding the limit of a single point, which is particularly practical on site.

W
W.X 8 hours ago

@Nina Han 感谢补充,讲得更全面了。

Regression and Modeling

Regression R ² is okay, but the residuals are regular. How to troubleshoot model issues?

The fitting degree is acceptable, but the residual varies regularly with the fitting value. I would like to clarify the direction of investigation.

NNina Wang, R&D Engineer 8 hours ago Views 1682 Reply 3 Likes 58
The regression equation R ² looks good, but the residual plot shows a trend or trumpet shape with the fitting value. I would like to ask if this situation generally indicates that the model is missing any items (nonlinearity, interaction, or missing factors). When troubleshooting, first look at the residual pattern and then decide whether to add items or change methods.

Discussion 3

r
ruby_1998 8 hours ago

Stepping through similar pitfalls, selecting directions based on rankings in the early stages, only to realize that the problem is not truly important after completion. Defining the problem first is more laborious than rushing to use tools.

north
North Island · A 8 hours ago

After reading, it was inspiring. Thank you for sharing.

D
D.B 8 hours ago

We have also encountered similar situations on site. First, we will look at the batch or machine layer by layer, and the trend will be much clearer than mixing them together. It is recommended to align the caliber with the Sample Size before drawing a conclusion.

Hypothesis Testing and Analysis of Variance (ANOVA)

Before conducting Hypothesis Testing, we need to verify the data prerequisites

Share the verification process before testing: normality, homogeneity of variance, sample pairing, and then select the testing method.

KKyle Liu · Reliability Engineer 8 hours ago Views 1644 Reply 1 Likes 56
Share the verification steps before conducting Hypothesis Testing. Firstly, check whether the data is paired and the sample size, then use normality test and distribution chart to determine the distribution pattern, and compare whether the variances of each group are uniform; The premise is to use parameter testing, but not to use non parametric methods. Checking the premises clearly before inspection is more meaningful than dwelling on p-values afterwards.

Discussion 1

Han
Han Julie 8 hours ago

Additional point: Whether the conclusion can be implemented depends on the business context. Statistically significant results do not necessarily mean that action must be taken. It is more reliable to judge based on costs and on-site conditions.

moon
Moon Shadow · Julie 8 hours ago

@Han Julie 对,工具出结果,人来把关。

Graphic Analysis and Exploration

How to combine boxplots and histograms to determine distribution and outliers?

I want to clarify what each of the two graphs looks at and how to combine them to determine distribution patterns and outliers.

LLeo.D · Quality Engineer 8 hours ago Views 1078 Reply 1 Likes 38
A set of data was first plotted as a histogram and then as a box plot. I would like to ask which of these two plots are suitable for viewing: a histogram shows distribution patterns and peak offsets, while a box plot shows Median, quartiles, and outliers; When the conclusions of the two are inconsistent, which one should prevail and whether outliers should be removed before analysis.

Discussion 1

q
quinn.1999 8 hours ago

We have also encountered similar situations on site. First, we will look at the batch or machine layer by layer, and the trend will be much clearer than mixing them together. It is recommended to align the caliber with the Sample Size before drawing a conclusion.

small
Assistant Professor U Official 8 hours ago

@quinn.1999Layered analysis is indeed crucial. After disassembling by batch or machine, the box plot can quickly locate outliers, and the histogram can be used to examine the overall shape and skewness. Align the caliber and Sample Size before comparing, and the conclusion will be more stable.

Graphic Analysis and Exploration

What chart is the most intuitive way to compare distribution differences among multiple teams?

Comparing data from several teams, I want to find the most intuitive graph to display the distribution and mean difference.

northNorth Island Ho Reliability Engineer 8 hours ago Views 1291 Reply 3 Likes 71
To compare the key size distribution of several teams, I would like to ask if using a boxplot, interval plot, or histogram arranged side by side would be more intuitive; When the sample sizes of each group are different, how to present them graphically so as not to misinterpret the differences in sample sizes as horizontal differences; In addition to graphics, what statistical measures are used together to form a more stable conclusion.

Discussion 3

j
jack.zhu 8 hours ago

Stepping through similar pitfalls, selecting directions based on rankings in the early stages, only to realize that the problem is not truly important after completion. Defining the problem first is more laborious than rushing to use tools.

bright
Langrun-Y 8 hours ago

After reading, it was inspiring. Thank you for sharing.

contain
Containing chapters Wu 8 hours ago

We have also encountered similar situations on site. First, we will look at the batch or machine layer by layer, and the trend will be much clearer than mixing them together. It is recommended to align the caliber with the Sample Size before drawing a conclusion.

Hypothesis Testing and Analysis of Variance (ANOVA)

How to choose non parametric methods for inter group comparison of non normal data?

Which non parametric test should be used for inter group comparison if the data skews and does not satisfy normality, and clarify the selection criteria.

TangTang Jane, Quality Supervisor 8 hours ago Views 1429 Reply 1 Likes 45
The distribution of several sets of data is skewed, and the sample size is not large, which does not meet the premise of parameter testing. I would like to ask what are the common methods for comparing non parametric groups, and how to choose between two groups and multiple groups; How to combine Median and distribution morphology to interpret actual differences after significant non parametric testing.

Discussion 1

K
Ken Zhang 8 hours ago

The key to this problem is to first distinguish whether it is a center shift or excessive fluctuation, and then decide whether to adjust the mean or decrease it. Comparing the histogram and time series is more intuitive.

Data import and organization

How to handle column names and missing values in Excel multi table merge import?

After merging multiple worksheets, the column names are inconsistent and there are empty values. I would like to inquire about the sorting steps before importing.

observeGuanlan_Xu · Product Engineer 8 hours ago Views 1203 Reply 1 Likes 39
Several Excel worksheets in hand have similar structures but slightly different column names. After merging and importing, there are several columns that are not aligned and contain empty values. I would like to ask how to unify column names and merge multiple tables before importing, and whether missing values should be annotated during the import process or processed after importing; Is there a fixed sorting order that can avoid factor misalignment after merging.

Discussion 1

B
Ben Deng 8 hours ago

Additional point: Whether the conclusion can be implemented depends on the business context. Statistically significant results do not necessarily mean that action must be taken. It is more reliable to judge based on costs and on-site conditions.

small
Assistant Professor U Official 8 hours ago

@Ben Deng 你说得对,结论落地确实要结合业务语境和成本判断。回到多表合并,建议先统一列名映射表,缺失值按业务含义区分填充或标记,再导入,能减少后续误判。

Data import and organization

What are the precautions for batch conversion to numerical values when the data type is mistakenly identified as text?

Some numerical columns stored as text cannot be calculated. I would like to confirm the prerequisites and troubleshooting items for batch conversion.

ChenChen Olive SQE 8 hours ago Views 1661 Reply 2 Likes 70
After importing, it was found that several columns of parameters were in text format and could not be selected in the statistics and control charts. I would like to ask which hidden characters or unit symbols need to be checked before converting text into numerical values in bulk; What are the common reasons for missing values after conversion, and how to determine whether it is due to missing data or formatting issues.

Discussion 2

Guo
Guo Ian 8 hours ago

We have also encountered it in our project, add a layered perspective. 💡

S
Sara.D56 8 hours ago

It is recommended to review the Measurement System first. If the deterioration caused by measuring tools and operating methods is not ruled out, the subsequent analysis conclusions may be biased.

Industry practical cases

Improvement in Process Capability: From excessive fluctuations to stable Cpk (Process Capability Index) at 1.67

Improvement of review ability: First distinguish between center offset and excessive fluctuations, and then start with the machine, materials, and measurement system.

bBen · 1999 · R&D Engineer 8 hours ago Views 1361 Reply 3 Likes 37
Record a critical dimension capability improvement once. At the beginning, Cp and Cpk (Process Capability Index) are both low. First, determine whether it is due to excessive fluctuations or center shift: look at the spread in the histogram and compare it with the target mean to see how much it deviates. Identify that the main variation comes from loose fixtures on a certain machine and fluctuations in a batch of materials. Perform fixture calibration and material layering tracking separately, and the Measurement System will review the GR& Re test after R. After two rounds, Cpk (Process Capability Index) remained stable around 1.67, and Ppk also followed suit. The biggest experience is to first distinguish the type of deterioration before taking action.

Discussion 3

H
Henry Cao 8 hours ago

The key to this problem is to first distinguish whether it is a center shift or excessive fluctuation, and then decide whether to adjust the mean or decrease it. Comparing the histogram and time series is more intuitive.

C
Cathy_A 8 hours ago

Good article, clear thinking, collected.

Shen
Shen Wendy 8 hours ago

After layering, the trend and differentiation rules can be overlaid, and slow drift can be observed even without exceeding the limit of a single point, which is particularly practical on site.

Design of Experiments (DOE)

How to set the level of the factors to be studied in a customized design, given the fixed level of known factors?

How to determine the range of factors to be studied in Design of Experiments (DOE) while maintaining the current level of some factors.

seaHai Ruo Wu · Process Engineer 8 hours ago Views 1500 Reply 3 Likes 71
When doing custom Design of Experiments (DOE), if the stable factors are known and want to be fixed at the existing level, the factors to be studied need to be set at both high and low levels. I would like to inquire about the basis for determining the level range of the factors to be studied. If it is too broad, it is easy to produce nonconforming products, and if it is too narrow, no effect can be observed; How to verify feasibility using historical data after setting the level.

Discussion 3

beginning
Chu Qing Ho 8 hours ago

Stepping through similar pitfalls, selecting directions based on rankings in the early stages, only to realize that the problem is not truly important after completion. Defining the problem first is more laborious than rushing to use tools. 👍

Peng
Peng Helen 8 hours ago

Logic runs smoothly, compared to my own on-site experience.

m
mia.2002 8 hours ago

We have also encountered similar situations on site. First, we will look at the batch or machine layer by layer, and the trend will be much clearer than mixing them together. It is recommended to align the caliber with the Sample Size before drawing a conclusion.

H
H.E 8 hours ago

@mia.2002 有道理,业务判断这步替代不了。

Quality Tools (MSA/SPC/Process Capability)

We have a quality review process that links MSA, SPC, and Process Capability together

Share the quality review sequence: first review the Measurement System, then review the Control Chart Stability, and finally evaluate the Process Capability.

moonMoon Shadow - Ruby · Quality Engineer 8 hours ago Views 937 Reply 1 Likes 58
Share the sequence of our internal quality review process. Firstly, review the Measurement System to eliminate any deviations caused by measuring tools and techniques, and then check the SPC Control Chart to determine if the process is stable and controlled; Evaluate the Process Capability Index (Cp) only after the process has stabilized. If the order is reversed, issues with the Measurement System or Stability may be mistaken for insufficient product capabilities, leading to biased conclusions.

Discussion 1

s
sam_ye 8 hours ago

It is recommended to review the Measurement System first. If the deterioration caused by measuring tools and operating methods is not ruled out, the subsequent analysis conclusions may be biased.

Data import and organization

Our unified cleaning checklist before importing data from multiple sources

Share the pre import cleaning checklist: column names, units, missing values, abnormal rows, check first and then analyze.

VVictor Luo · Product Engineer 8 hours ago Views 1036 Reply 3 Likes 65
Share our cleaning checklist before importing data from multiple sources. First, unify the column names and units, delete empty columns and duplicate rows; Missing values are marked separately and do not default to zero filling; Outlier first records the reasons before deciding whether to keep or remove. After importing, check the number of rows, columns, and types of each column, confirm that they are correct, and then make graphics and inspections. The list is not complicated, but it can block most of the rework later on.

Discussion 3

n
nina.hu 8 hours ago

After layering, the trend and differentiation rules can be overlaid, and slow drift can be observed even without exceeding the limit of a single point, which is particularly practical on site.

K
Kyle.K 8 hours ago

Good article, clear thinking, collected.

week
Zhou Kyle 8 hours ago

It is recommended to review the Measurement System first. If the deterioration caused by measuring tools and operating methods is not ruled out, the subsequent analysis conclusions may be biased.